Compliance
The Living Waterways project has been established by a team of multi-disciplinary professionals. The following table outlines the practitioners involved with their needs and responsibilities within each element of the framework as well as an outline of the types of documentation required to satisfy Development Application approvals.
| Signoff | Documentation | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Suitably qualified stormwater professional | Registered Landscape Architect | Registered Profesional Engineer QLD (RPEQ) | Certified Profesional in Erosion and Sediment Control (CPESC) | Ecologist | Stormwater Management Plan (SMP) | Landscape plan | Ecological Report | Submission statement | ||
| LW1 | STORMWATER QUALITY | |||||||||
| LW2 | EROSION AND SEDIMENT CONTROL | |||||||||
| LW3 | MAINTAIN NATURAL HYDROLOGY | |||||||||
| LW4 | PERVIOUS SURFACES | |||||||||
| LW5 | WATER HARVESTING | |||||||||
| LE1 | PROTECT RIPARIAN AND AQUATIC HABITAT | |||||||||
| LE2 | PROTECT BIODIVERSITY VALUES | |||||||||
| LE3 | BIODIVERSITY REHABILITATION | |||||||||
| LE4 | SUSTAINABLE LANDSCAPED AREAS | |||||||||
| LC1 | ENHANCED AMENITY | |||||||||
| LC2 | RANGES OF EXPERIENCES | |||||||||
| LC3 | INTEGRATED EDUCATION | |||||||||
| LC4 | NATURAL, HISTORICAL AND CULTURAL IDENTITY | |||||||||
| LC5 | SOCIAL TIES | |||||||||
| LC6 | OUTDOOR CONTEMPLATIVE VALUES | |||||||||
| LC7 | HEALTHY LIVING | |||||||||
| LC8 | SAFE AND WELCOMING PLACES | |||||||||
| LLE1 | WHOLE OF LIFE COSTS | |||||||||
| LLE2 | MAINTENANCE AND ACCESS | |||||||||
| LLE3 | CIRCULAR ECONOMIES | |||||||||